CALCULATOR

Menu

Calculator

Price list updated at

03.11.2025

Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.

Calculate yourself

Order an estimate

1. Eurofence made of concrete slabs, unpainted (8)

Name of work Cost Quantity Total
1.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
1.2. Cleaning of the food supply with rammers 100 ₴ м.п.
1.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
1.4. Formwork installation/dismantling 205 ₴ м.п.
1.5. Manufacturing of reinforcing cage 15 000 ₴ т
1.6. Concreting the foundation 1 400 ₴ м3
1.7. Installation of a fence made of concrete slabs 575 ₴ м.п.
1.8. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт

Total:

2. Eurofence made of painted concrete slabs (10)

Name of work Cost Quantity Total
2.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
2.2. Cleaning of the food supply with rammers 100 ₴ м.п.
2.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
2.4. Formwork installation/dismantling 205 ₴ м.п.
2.5. Manufacturing of reinforcing cage 15 000 ₴ т
2.6. Concreting the foundation 1 400 ₴ м3
2.7. Installation of a fence made of concrete slabs 575 ₴ м.п.
2.8. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
2.9. Fence primer 35 ₴ м2
2.10. Painting the fence 150 ₴ м2

Total:

3. Solid wood (10)

Name of work Cost Quantity Total
3.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
3.2. Cleaning of the food supply with rammers 100 ₴ м.п.
3.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
3.4. Formwork installation/dismantling 205 ₴ м.п.
3.5. Manufacturing of reinforcing cage 15 000 ₴ т
3.6. Concreting the foundation 1 400 ₴ м3
3.7. Installation of a wooden fence 750 ₴ м.п.
3.8. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
3.9. Fence primer 35 ₴ м2
3.10. Painting the fence 150 ₴ м2

Total:

4. Made of wood with brick columns (10)

Name of work Cost Quantity Total
4.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
4.2. Cleaning of the food supply with rammers 100 ₴ м.п.
4.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
4.4. Formwork installation/dismantling 205 ₴ м.п.
4.5. Manufacturing of reinforcing cage 15 000 ₴ т
4.6. Concreting the foundation 1 400 ₴ м3
4.7. Installation of a wooden fence with brick columns and installation of a cap on a post 1 925 ₴ м.п.
4.8. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
4.9. Fence primer 35 ₴ м2
4.10. Painting the fence 150 ₴ м2

Total:

5. Solid brick (8)

Name of work Cost Quantity Total
5.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
5.2. Cleaning of the food supply with rammers 100 ₴ м.п.
5.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
5.4. Formwork installation/dismantling 205 ₴ м.п.
5.5. Manufacturing of reinforcing cage 15 000 ₴ т
5.6. Concreting the foundation 1 400 ₴ м3
5.7. Laying a brick fence with jointing 4 700 ₴ м.п.
5.8. Installation of covers 350 ₴ шт

Total:

6. Made of brick with corrugated sheet filling between columns (8)

Name of work Cost Quantity Total
6.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
6.2. Cleaning of the food supply with rammers 100 ₴ м.п.
6.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
6.4. Formwork installation/dismantling 205 ₴ м.п.
6.5. Manufacturing of reinforcing cage 15 000 ₴ т
6.6. Concreting the foundation 1 400 ₴ м3
6.7. Laying a brick fence with installation of guides for corrugated sheets and installation of corrugated sheets 3 600 ₴ м.п.
6.8. Installation of covers 350 ₴ шт

Total:

7. Made of brick with wood filling between columns (8)

Name of work Cost Quantity Total
7.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
7.2. Cleaning of the food supply with rammers 100 ₴ м.п.
7.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
7.4. Formwork installation/dismantling 205 ₴ м.п.
7.5. Manufacturing of reinforcing cage 15 000 ₴ т
7.6. Concreting the foundation 1 400 ₴ м3
7.7. Laying a brick fence with installation of guides for cladding and wood cladding 3 600 ₴ м.п.
7.8. Installation of covers 350 ₴ шт

Total:

8. Made of brick with polycarbonate filling between columns (8)

Name of work Cost Quantity Total
8.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
8.2. Cleaning of the food supply with rammers 100 ₴ м.п.
8.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
8.4. Formwork installation/dismantling 205 ₴ м.п.
8.5. Manufacturing of reinforcing cage 15 000 ₴ т
8.6. Concreting the foundation 1 400 ₴ м3
8.7. Laying a brick fence with installation of guides for cladding and polycarbonate cladding 3 850 ₴ м.п.
8.8. Installation of covers 350 ₴ шт

Total:

9. Made of brick with rubble filling between columns (8)

Name of work Cost Quantity Total
9.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
9.2. Cleaning of the food supply with rammers 100 ₴ м.п.
9.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
9.4. Formwork installation/dismantling 205 ₴ м.п.
9.5. Manufacturing of reinforcing cage 15 000 ₴ т
9.6. Concreting the foundation 1 400 ₴ м3
9.7. Laying a brick fence with rubble filling between columns 4 600 ₴ м.п.
9.8. Installation of covers 350 ₴ шт

Total:

10. Solid rubble stone (8)

Name of work Cost Quantity Total
10.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
10.2. Cleaning of the food supply with rammers 100 ₴ м.п.
10.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
10.4. Formwork installation/dismantling 205 ₴ м.п.
10.5. Manufacturing of reinforcing cage 15 000 ₴ т
10.6. Concreting the foundation 1 400 ₴ м3
10.7. Laying a brick fence with rubble filling between columns 4 850 ₴ м.п.
10.8. Laying a fence from rubble stone 350 ₴ шт

Total:

11. Made of rubble stone with brick filling between columns (8)

Name of work Cost Quantity Total
11.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
11.2. Cleaning of the food supply with rammers 100 ₴ м.п.
11.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
11.4. Formwork installation/dismantling 205 ₴ м.п.
11.5. Manufacturing of reinforcing cage 15 000 ₴ т
11.6. Concreting the foundation 1 400 ₴ м3
11.7. Laying a fence from rubble with filling between columns with bricks 5 500 ₴ м.п.
11.8. Installation of covers 350 ₴ шт

Total:

12. Made of rubble stone with corrugated sheet filling between columns (8)

Name of work Cost Quantity Total
12.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
12.2. Cleaning of the food supply with rammers 100 ₴ м.п.
12.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
12.4. Formwork installation/dismantling 205 ₴ м.п.
12.5. Manufacturing of reinforcing cage 15 000 ₴ т
12.6. Concreting the foundation 1 400 ₴ м3
12.7. Laying a fence from rubble with filling between columns with corrugated sheets 5 800 ₴ м.п.
12.8. Installation of covers 350 ₴ шт

Total:

13. Made of rubble stone with metal grating filling between columns (8)

Name of work Cost Quantity Total
13.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
13.2. Cleaning of the food supply with rammers 100 ₴ м.п.
13.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
13.4. Formwork installation/dismantling 205 ₴ м.п.
13.5. Manufacturing of reinforcing cage 15 000 ₴ т
13.6. Concreting the foundation 1 400 ₴ м3
13.7. Laying a fence from rubble with filling between columns with a metal lattice 5 800 ₴ м.п.
13.8. Installation of covers 350 ₴ шт

Total:

14. From a solid decorative block (11)

Name of work Cost Quantity Total
14.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
14.2. Cleaning of the food supply with rammers 100 ₴ м.п.
14.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
14.4. Formwork installation/dismantling 205 ₴ м.п.
14.5. Manufacturing of reinforcing cage 15 000 ₴ т
14.6. Concreting the foundation 1 400 ₴ м3
14.7. Laying decorative block 100 ₴ шт
14.8. Installation of covers 350 ₴ шт
14.9. Reinforcement of columns and longitudinal rows of blocks 30 ₴ м.п.
14.10. Concreting of block voids 1 500 ₴ м3
14.11. Preparing concrete manually 1 500 ₴ м3

Total:

15. From a decorative block with brick filling between the columns (11)

Name of work Cost Quantity Total
15.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
15.2. Cleaning of the food supply with rammers 100 ₴ м.п.
15.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
15.4. Formwork installation/dismantling 205 ₴ м.п.
15.5. Manufacturing of reinforcing cage 15 000 ₴ т
15.6. Concreting the foundation 1 400 ₴ м3
15.7. Laying a column from a decorative block with filling between the columns with bricks 4 200 ₴ м.п.
15.8. Installation of covers 350 ₴ шт
15.9. Reinforcement of columns and longitudinal rows of blocks 30 ₴ м.п.
15.10. Concreting of block voids 1 500 ₴ м3
15.11. Preparing concrete manually 1 500 ₴ м3

Total:

16. From a decorative block with filling between columns with corrugated sheets (11)

Name of work Cost Quantity Total
16.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
16.2. Cleaning of the food supply with rammers 100 ₴ м.п.
16.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
16.4. Formwork installation/dismantling 205 ₴ м.п.
16.5. Manufacturing of reinforcing cage 15 000 ₴ т
16.6. Concreting the foundation 1 400 ₴ м3
16.7. Laying a column from a decorative block with filling between the columns with bricks 3 550 ₴ м.п.
16.8. Installation of covers 350 ₴ шт
16.9. Reinforcement of columns and longitudinal rows of blocks 30 ₴ м.п.
16.10. Concreting of block voids 1 500 ₴ м3
16.11. Preparing concrete manually 1 500 ₴ м3

Total:

17. From a decorative block with filling between columns with rubble (11)

Name of work Cost Quantity Total
17.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
17.2. Cleaning of the food supply with rammers 100 ₴ м.п.
17.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
17.4. Formwork installation/dismantling 205 ₴ м.п.
17.5. Manufacturing of reinforcing cage 15 000 ₴ т
17.6. Concreting the foundation 1 400 ₴ м3
17.7. Laying a column from a decorative block with filling between the columns with rubble 5 950 ₴ м.п.
17.8. Installation of covers 350 ₴ шт
17.9. Reinforcement of columns and longitudinal rows of blocks 30 ₴ м.п.
17.10. Concreting of block voids 1 500 ₴ м3
17.11. Preparing concrete manually 1 500 ₴ м3

Total:

18. From a decorative block with filling between the columns with a metal lattice (11)

Name of work Cost Quantity Total
18.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
18.2. Cleaning of the food supply with rammers 100 ₴ м.п.
18.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
18.4. Formwork installation/dismantling 205 ₴ м.п.
18.5. Manufacturing of reinforcing cage 15 000 ₴ т
18.6. Concreting the foundation 1 400 ₴ м3
18.7. Laying a column from a decorative block with filling between the columns with a metal lattice 5 950 ₴ м.п.
18.8. Installation of covers 350 ₴ шт
18.9. Reinforcement of columns and longitudinal rows of blocks 30 ₴ м.п.
18.10. Concreting of block voids 1 500 ₴ м3
18.11. Preparing concrete manually 1 500 ₴ м3

Total:

19. From corrugated sheets on metal poles (11)

Name of work Cost Quantity Total
19.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
19.2. Cleaning of the food supply with rammers 100 ₴ м.п.
19.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
19.4. Formwork installation/dismantling 205 ₴ м.п.
19.5. Manufacturing of reinforcing cage 15 000 ₴ т
19.6. Concreting the foundation 1 400 ₴ м3
19.7. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
19.8. Installation of fence guides in 2 rows 100 ₴ м.п.
19.9. Painting the fence 150 ₴ м.п.
19.10. Installation of corrugated sheeting on a fence 305 ₴ м.п.
19.11. Installation of U-shaped strip 120 ₴ м.п.

Total:

20. From picket fence on metal poles (10)

Name of work Cost Quantity Total
20.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
20.2. Cleaning of the food supply with rammers 100 ₴ м.п.
20.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
20.4. Formwork installation/dismantling 205 ₴ м.п.
20.5. Manufacturing of reinforcing cage 15 000 ₴ т
20.6. Concreting the foundation 1 400 ₴ м3
20.7. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
20.8. Installation of fence guides in 2 rows 100 ₴ м.п.
20.9. Painting the fence 150 ₴ м.п.
20.10. Installation of picket fence (one side 70% sheathing or 2 sides 50% sheathing) 275 ₴ м.п.

Total:

21. From metal siding on metal posts (10)

Name of work Cost Quantity Total
21.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
21.2. Cleaning of the food supply with rammers 100 ₴ м.п.
21.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
21.4. Formwork installation/dismantling 205 ₴ м.п.
21.5. Manufacturing of reinforcing cage 15 000 ₴ т
21.6. Concreting the foundation 1 400 ₴ м3
21.7. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
21.8. Installation of fence guides in 2 rows 100 ₴ м.п.
21.9. Painting the fence 150 ₴ м.п.
21.10. Installation of metal siding 300 ₴ м.п.

Total:

22. From a chain-link mesh without a frame (8)

Name of work Cost Quantity Total
22.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
22.2. Cleaning of the food supply with rammers 100 ₴ м.п.
22.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
22.4. Formwork installation/dismantling 205 ₴ м.п.
22.5. Manufacturing of reinforcing cage 15 000 ₴ т
22.6. Concreting the foundation 1 400 ₴ м3
22.7. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
22.8. Installation of chain-link fencing 200 ₴ м.п.

Total:

23. From a chain-link mesh with a metal frame (8)

Name of work Cost Quantity Total
23.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
23.2. Cleaning of the food supply with rammers 100 ₴ м.п.
23.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
23.4. Formwork installation/dismantling 205 ₴ м.п.
23.5. Manufacturing of reinforcing cage 15 000 ₴ т
23.6. Concreting the foundation 1 400 ₴ м3
23.7. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
23.8. Manufacturing and installation of metal frames with chain-link fencing 575 ₴ м.п.

Total:

24. From 3D mesh (8)

Name of work Cost Quantity Total
24.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
24.2. Cleaning of the food supply with rammers 100 ₴ м.п.
24.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
24.4. Formwork installation/dismantling 205 ₴ м.п.
24.5. Manufacturing of reinforcing cage 15 000 ₴ т
24.6. Concreting the foundation 1 400 ₴ м3
24.7. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
24.8. Installation of 3D mesh 425 ₴ м.п.

Total:

25. From metal and forged elements (8)

Name of work Cost Quantity Total
25.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
25.2. Cleaning of the food supply with rammers 100 ₴ м.п.
25.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
25.4. Formwork installation/dismantling 205 ₴ м.п.
25.5. Manufacturing of reinforcing cage 15 000 ₴ т
25.6. Concreting the foundation 1 400 ₴ м3
25.7. Concreting of free-standing pillars (if a strip foundation is not being made) 350 ₴ шт
25.8. Installation of a fence made of metal and forged elements 3 850 ₴ м.п.

Total:

26. Made of solid gabions (7)

Name of work Cost Quantity Total
26.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
26.2. Cleaning of the food supply with rammers 100 ₴ м.п.
26.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
26.4. Formwork installation/dismantling 205 ₴ м.п.
26.5. Manufacturing of reinforcing cage 15 000 ₴ т
26.6. Concreting the foundation 1 400 ₴ м3
26.7. Installation of a gabion fence 2 750 ₴ м.п.

Total:

27. From gabions with wood filling between columns (7)

Name of work Cost Quantity Total
27.1. Ritting trenches for pouring the foundation 150 ₴ м.п.
27.2. Cleaning of the food supply with rammers 100 ₴ м.п.
27.3. Arrangement of crushed stone bedding with tamping 110 ₴ м.п.
27.4. Formwork installation/dismantling 205 ₴ м.п.
27.5. Manufacturing of reinforcing cage 15 000 ₴ т
27.6. Concreting the foundation 1 400 ₴ м3
27.7. Installation of a gabion fence with wood filling between the columns 2 850 ₴ м.п.

Total:

28. From concrete slabs (1)

Name of work Cost Quantity Total
28.1. Construction of a prefabricated fence made of concrete slabs 600 ₴ м.п.

Total:

29. Additional robots (4)

Name of work Cost Quantity Total
29.1. Regular sliding gates 10 000 ₴ шт
29.2. Swing gates with automation 9 000 ₴ шт
29.3. Swing gates without automation 7 000 ₴ шт
29.4. Gate 3 500 ₴ шт

Total:

30. Dismantling works (14)

Name of work Cost Quantity Total
30.1. Dismantling the gate 5 000 ₴ шт
30.2. Dismantling the gate 1 750 ₴ шт
30.3. Dismantling a prefabricated fence made of concrete slabs 300 ₴ м.п.
30.4. Dismantling a gabion fence 1 350 ₴ м.п.
30.5. Dismantling a fence made of metal and forged elements 1 750 ₴ м.п.
30.6. Dismantling the 3D mesh 215 ₴ м.п.
30.7. Dismantling the chain-link fencing 100 ₴ м.п.
30.8. Removing metal siding 150 ₴ м.п.
30.9. Dismantling the fence 140 ₴ м.п.
30.10. Dismantling corrugated sheets 155 ₴ м.п.
30.11. Dismantling the decorative block 50 ₴ шт
30.12. Dismantling a brick fence 2 200 ₴ м.п.
30.13. Dismantling a wooden fence 405 ₴ м.п.
30.14. Dismantling a fence made of concrete slabs 290 ₴ м.п.

Total:

Total: 0



1. Additional expenses (10)

Name of work Cost Quantity Total
1.1. Loader services (price negotiable) 0 ₴
1.2. Delivery of materials (price negotiable) 0 ₴
1.3. Garbage removal (price negotiable) 0 ₴
1.4. Overhead costs (15% of the cost of work) https://rbk-alba.com/ua/blog/nakladnye-rasxody-cto-vklyucaet-v-sebya-eto-ponyatie 15 ₴ %
1.5. Designer and architect services (price negotiable) 0 ₴
1.6. Lawyer services (price negotiable) 0 ₴
1.7. Technical services (price negotiable) 0 ₴
1.8. Rental of premises for storing construction materials and tools (price negotiable) 0 ₴
1.9. Renting premises for the masters (price negotiable) 0 ₴
1.10. Registration of permits (price negotiable) 0 ₴

Total:

Total: 0

The cost is calculated approximately taking into account the full package of services and the volume specified by you.

By clicking the button, you agree to the terms Privacy Policy

Affects the price:

  • location of the facility;
  • number and complexity of work;
  • what material and what technology to use to perform the work;
  • the amount of preparatory, loading and unloading and logistics costs;
  • completion period (compressed or uniform);
  • prices for construction materials;
  • working hours (day/night/24/7);
  • normal or short terms/work at height;
  • good weather;
  • absence of obstacles from external factors (war, strike, blocked streets, significant price increases, natural disasters);
  • the speed of the customer's decision-making;
  • coordination of work with other contractors;
  • timely acceptance and payment for completed work.