Price list updated at
03.11.2025
Good afternoon our potential customer. By following these instructions, you will be able to make a preliminary estimate within 3-5 minutes and understand how much your future repair or construction will cost.
To do this you need:
1. Click the "Calculate yourself" button.
2. Select the required service in the required section.
3. Write the quantity + click the “Add to estimate” button.
4. After all selected services, scroll down to the “Your estimate” section. Check if everything is correct or if you need to add or remove something (to remove it, there is a “Delete” button).
5. Then fill in all the information about yourself and the object + click the “Upload estimate” button. A preliminary estimate in PDF format will be downloaded to your PC (or smartphone), which is convenient to read, check whether all work is indicated and print (if necessary).
If, based on the preliminary estimate, you understand that the prices suit you, then call the indicated numbers and we will arrange a meeting with you at your facility.
Calculate yourself
Order an estimate
1. Eurofence made of concrete slabs, unpainted (8)
| Name of work | Cost | Quantity | Total |
| 1.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 1.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 1.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 1.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 1.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 1.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 1.7. Installation of a fence made of concrete slabs | 575 ₴ | м.п. | |
| 1.8. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт |
2. Eurofence made of painted concrete slabs (10)
| Name of work | Cost | Quantity | Total |
| 2.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 2.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 2.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 2.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 2.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 2.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 2.7. Installation of a fence made of concrete slabs | 575 ₴ | м.п. | |
| 2.8. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 2.9. Fence primer | 35 ₴ | м2 | |
| 2.10. Painting the fence | 150 ₴ | м2 |
3. Solid wood (10)
| Name of work | Cost | Quantity | Total |
| 3.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 3.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 3.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 3.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 3.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 3.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 3.7. Installation of a wooden fence | 750 ₴ | м.п. | |
| 3.8. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 3.9. Fence primer | 35 ₴ | м2 | |
| 3.10. Painting the fence | 150 ₴ | м2 |
4. Made of wood with brick columns (10)
| Name of work | Cost | Quantity | Total |
| 4.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 4.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 4.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 4.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 4.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 4.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 4.7. Installation of a wooden fence with brick columns and installation of a cap on a post | 1 925 ₴ | м.п. | |
| 4.8. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 4.9. Fence primer | 35 ₴ | м2 | |
| 4.10. Painting the fence | 150 ₴ | м2 |
5. Solid brick (8)
| Name of work | Cost | Quantity | Total |
| 5.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 5.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 5.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 5.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 5.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 5.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 5.7. Laying a brick fence with jointing | 4 700 ₴ | м.п. | |
| 5.8. Installation of covers | 350 ₴ | шт |
6. Made of brick with corrugated sheet filling between columns (8)
| Name of work | Cost | Quantity | Total |
| 6.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 6.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 6.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 6.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 6.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 6.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 6.7. Laying a brick fence with installation of guides for corrugated sheets and installation of corrugated sheets | 3 600 ₴ | м.п. | |
| 6.8. Installation of covers | 350 ₴ | шт |
7. Made of brick with wood filling between columns (8)
| Name of work | Cost | Quantity | Total |
| 7.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 7.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 7.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 7.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 7.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 7.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 7.7. Laying a brick fence with installation of guides for cladding and wood cladding | 3 600 ₴ | м.п. | |
| 7.8. Installation of covers | 350 ₴ | шт |
8. Made of brick with polycarbonate filling between columns (8)
| Name of work | Cost | Quantity | Total |
| 8.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 8.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 8.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 8.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 8.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 8.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 8.7. Laying a brick fence with installation of guides for cladding and polycarbonate cladding | 3 850 ₴ | м.п. | |
| 8.8. Installation of covers | 350 ₴ | шт |
9. Made of brick with rubble filling between columns (8)
| Name of work | Cost | Quantity | Total |
| 9.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 9.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 9.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 9.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 9.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 9.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 9.7. Laying a brick fence with rubble filling between columns | 4 600 ₴ | м.п. | |
| 9.8. Installation of covers | 350 ₴ | шт |
10. Solid rubble stone (8)
| Name of work | Cost | Quantity | Total |
| 10.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 10.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 10.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 10.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 10.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 10.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 10.7. Laying a brick fence with rubble filling between columns | 4 850 ₴ | м.п. | |
| 10.8. Laying a fence from rubble stone | 350 ₴ | шт |
11. Made of rubble stone with brick filling between columns (8)
| Name of work | Cost | Quantity | Total |
| 11.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 11.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 11.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 11.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 11.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 11.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 11.7. Laying a fence from rubble with filling between columns with bricks | 5 500 ₴ | м.п. | |
| 11.8. Installation of covers | 350 ₴ | шт |
12. Made of rubble stone with corrugated sheet filling between columns (8)
| Name of work | Cost | Quantity | Total |
| 12.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 12.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 12.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 12.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 12.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 12.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 12.7. Laying a fence from rubble with filling between columns with corrugated sheets | 5 800 ₴ | м.п. | |
| 12.8. Installation of covers | 350 ₴ | шт |
13. Made of rubble stone with metal grating filling between columns (8)
| Name of work | Cost | Quantity | Total |
| 13.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 13.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 13.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 13.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 13.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 13.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 13.7. Laying a fence from rubble with filling between columns with a metal lattice | 5 800 ₴ | м.п. | |
| 13.8. Installation of covers | 350 ₴ | шт |
14. From a solid decorative block (11)
| Name of work | Cost | Quantity | Total |
| 14.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 14.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 14.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 14.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 14.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 14.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 14.7. Laying decorative block | 100 ₴ | шт | |
| 14.8. Installation of covers | 350 ₴ | шт | |
| 14.9. Reinforcement of columns and longitudinal rows of blocks | 30 ₴ | м.п. | |
| 14.10. Concreting of block voids | 1 500 ₴ | м3 | |
| 14.11. Preparing concrete manually | 1 500 ₴ | м3 |
15. From a decorative block with brick filling between the columns (11)
| Name of work | Cost | Quantity | Total |
| 15.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 15.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 15.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 15.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 15.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 15.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 15.7. Laying a column from a decorative block with filling between the columns with bricks | 4 200 ₴ | м.п. | |
| 15.8. Installation of covers | 350 ₴ | шт | |
| 15.9. Reinforcement of columns and longitudinal rows of blocks | 30 ₴ | м.п. | |
| 15.10. Concreting of block voids | 1 500 ₴ | м3 | |
| 15.11. Preparing concrete manually | 1 500 ₴ | м3 |
16. From a decorative block with filling between columns with corrugated sheets (11)
| Name of work | Cost | Quantity | Total |
| 16.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 16.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 16.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 16.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 16.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 16.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 16.7. Laying a column from a decorative block with filling between the columns with bricks | 3 550 ₴ | м.п. | |
| 16.8. Installation of covers | 350 ₴ | шт | |
| 16.9. Reinforcement of columns and longitudinal rows of blocks | 30 ₴ | м.п. | |
| 16.10. Concreting of block voids | 1 500 ₴ | м3 | |
| 16.11. Preparing concrete manually | 1 500 ₴ | м3 |
17. From a decorative block with filling between columns with rubble (11)
| Name of work | Cost | Quantity | Total |
| 17.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 17.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 17.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 17.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 17.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 17.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 17.7. Laying a column from a decorative block with filling between the columns with rubble | 5 950 ₴ | м.п. | |
| 17.8. Installation of covers | 350 ₴ | шт | |
| 17.9. Reinforcement of columns and longitudinal rows of blocks | 30 ₴ | м.п. | |
| 17.10. Concreting of block voids | 1 500 ₴ | м3 | |
| 17.11. Preparing concrete manually | 1 500 ₴ | м3 |
18. From a decorative block with filling between the columns with a metal lattice (11)
| Name of work | Cost | Quantity | Total |
| 18.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 18.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 18.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 18.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 18.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 18.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 18.7. Laying a column from a decorative block with filling between the columns with a metal lattice | 5 950 ₴ | м.п. | |
| 18.8. Installation of covers | 350 ₴ | шт | |
| 18.9. Reinforcement of columns and longitudinal rows of blocks | 30 ₴ | м.п. | |
| 18.10. Concreting of block voids | 1 500 ₴ | м3 | |
| 18.11. Preparing concrete manually | 1 500 ₴ | м3 |
19. From corrugated sheets on metal poles (11)
| Name of work | Cost | Quantity | Total |
| 19.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 19.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 19.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 19.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 19.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 19.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 19.7. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 19.8. Installation of fence guides in 2 rows | 100 ₴ | м.п. | |
| 19.9. Painting the fence | 150 ₴ | м.п. | |
| 19.10. Installation of corrugated sheeting on a fence | 305 ₴ | м.п. | |
| 19.11. Installation of U-shaped strip | 120 ₴ | м.п. |
20. From picket fence on metal poles (10)
| Name of work | Cost | Quantity | Total |
| 20.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 20.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 20.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 20.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 20.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 20.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 20.7. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 20.8. Installation of fence guides in 2 rows | 100 ₴ | м.п. | |
| 20.9. Painting the fence | 150 ₴ | м.п. | |
| 20.10. Installation of picket fence (one side 70% sheathing or 2 sides 50% sheathing) | 275 ₴ | м.п. |
21. From metal siding on metal posts (10)
| Name of work | Cost | Quantity | Total |
| 21.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 21.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 21.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 21.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 21.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 21.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 21.7. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 21.8. Installation of fence guides in 2 rows | 100 ₴ | м.п. | |
| 21.9. Painting the fence | 150 ₴ | м.п. | |
| 21.10. Installation of metal siding | 300 ₴ | м.п. |
22. From a chain-link mesh without a frame (8)
| Name of work | Cost | Quantity | Total |
| 22.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 22.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 22.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 22.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 22.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 22.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 22.7. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 22.8. Installation of chain-link fencing | 200 ₴ | м.п. |
23. From a chain-link mesh with a metal frame (8)
| Name of work | Cost | Quantity | Total |
| 23.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 23.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 23.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 23.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 23.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 23.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 23.7. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 23.8. Manufacturing and installation of metal frames with chain-link fencing | 575 ₴ | м.п. |
24. From 3D mesh (8)
| Name of work | Cost | Quantity | Total |
| 24.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 24.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 24.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 24.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 24.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 24.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 24.7. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 24.8. Installation of 3D mesh | 425 ₴ | м.п. |
25. From metal and forged elements (8)
| Name of work | Cost | Quantity | Total |
| 25.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 25.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 25.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 25.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 25.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 25.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 25.7. Concreting of free-standing pillars (if a strip foundation is not being made) | 350 ₴ | шт | |
| 25.8. Installation of a fence made of metal and forged elements | 3 850 ₴ | м.п. |
26. Made of solid gabions (7)
| Name of work | Cost | Quantity | Total |
| 26.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 26.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 26.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 26.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 26.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 26.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 26.7. Installation of a gabion fence | 2 750 ₴ | м.п. |
27. From gabions with wood filling between columns (7)
| Name of work | Cost | Quantity | Total |
| 27.1. Ritting trenches for pouring the foundation | 150 ₴ | м.п. | |
| 27.2. Cleaning of the food supply with rammers | 100 ₴ | м.п. | |
| 27.3. Arrangement of crushed stone bedding with tamping | 110 ₴ | м.п. | |
| 27.4. Formwork installation/dismantling | 205 ₴ | м.п. | |
| 27.5. Manufacturing of reinforcing cage | 15 000 ₴ | т | |
| 27.6. Concreting the foundation | 1 400 ₴ | м3 | |
| 27.7. Installation of a gabion fence with wood filling between the columns | 2 850 ₴ | м.п. |
28. From concrete slabs (1)
| Name of work | Cost | Quantity | Total |
| 28.1. Construction of a prefabricated fence made of concrete slabs | 600 ₴ | м.п. |
29. Additional robots (4)
| Name of work | Cost | Quantity | Total |
| 29.1. Regular sliding gates | 10 000 ₴ | шт | |
| 29.2. Swing gates with automation | 9 000 ₴ | шт | |
| 29.3. Swing gates without automation | 7 000 ₴ | шт | |
| 29.4. Gate | 3 500 ₴ | шт |
30. Dismantling works (14)
| Name of work | Cost | Quantity | Total |
| 30.1. Dismantling the gate | 5 000 ₴ | шт | |
| 30.2. Dismantling the gate | 1 750 ₴ | шт | |
| 30.3. Dismantling a prefabricated fence made of concrete slabs | 300 ₴ | м.п. | |
| 30.4. Dismantling a gabion fence | 1 350 ₴ | м.п. | |
| 30.5. Dismantling a fence made of metal and forged elements | 1 750 ₴ | м.п. | |
| 30.6. Dismantling the 3D mesh | 215 ₴ | м.п. | |
| 30.7. Dismantling the chain-link fencing | 100 ₴ | м.п. | |
| 30.8. Removing metal siding | 150 ₴ | м.п. | |
| 30.9. Dismantling the fence | 140 ₴ | м.п. | |
| 30.10. Dismantling corrugated sheets | 155 ₴ | м.п. | |
| 30.11. Dismantling the decorative block | 50 ₴ | шт | |
| 30.12. Dismantling a brick fence | 2 200 ₴ | м.п. | |
| 30.13. Dismantling a wooden fence | 405 ₴ | м.п. | |
| 30.14. Dismantling a fence made of concrete slabs | 290 ₴ | м.п. |
Total: 0 ₴
1. Additional expenses (10)
| Name of work | Cost | Quantity | Total |
| 1.1. Loader services (price negotiable) | 0 ₴ | ||
| 1.2. Delivery of materials (price negotiable) | 0 ₴ | ||
| 1.3. Garbage removal (price negotiable) | 0 ₴ | ||
| 1.4. Overhead costs (15% of the cost of work) https://rbk-alba.com/ua/blog/nakladnye-rasxody-cto-vklyucaet-v-sebya-eto-ponyatie | 15 ₴ | % | |
| 1.5. Designer and architect services (price negotiable) | 0 ₴ | ||
| 1.6. Lawyer services (price negotiable) | 0 ₴ | ||
| 1.7. Technical services (price negotiable) | 0 ₴ | ||
| 1.8. Rental of premises for storing construction materials and tools (price negotiable) | 0 ₴ | ||
| 1.9. Renting premises for the masters (price negotiable) | 0 ₴ | ||
| 1.10. Registration of permits (price negotiable) | 0 ₴ |
Total: 0 ₴
The cost is calculated approximately taking into account the full package of services and the volume specified by you.